DR program design, high-availability architecture, RTO/RPO engineering, and validated recovery playbooks. Workloads restored to stable cloud infrastructure in 24 hours when infrastructure fails.
Application, data, and workload migration across AWS, Azure, and GCP through a structured five-stage process with near-zero downtime and rollback controls built into every cutover.
Cost analysis, right-sizing, reserved instance strategies, serverless architecture, and spend governance. Rationalization programs engineered to deliver 20-40% savings within 24 months with controls to sustain them.
Target architecture designed for performance, cost efficiency, and long-term operational control across AWS, Azure, and GCP. Workload portability built in from the start, avoiding lock-in and enabling flexibility.
Migration and Architecture
Operations and FinOps
Security and Compliance
Disaster Recovery and Continuity
Documented plans that have never been tested under real conditions. The plan exists; the actual recovery time is discovered during the incident.
Cloud migrations without proper architecture review, workload validation, and cutover controls create instability that outlasts the project. The migration completes; the instability does not.
Cloud bills that grow every month without clear attribution, right-sizing, or spend accountability. The spend becomes the budget problem nobody owns.
Cloud transformation programs with an end date that do not include ongoing optimization. The migration completes; the savings never materialize because nobody owns the rationalization phase.
Security controls retrofitted after workloads land in the cloud. Misconfiguration and exposure risk sits unaddressed until the first audit or incident forces remediation.
When infrastructure fails, Amiseq restores mission-critical workloads to stable cloud infrastructure within 24 hours. The business is back online before the impact is felt.
Applications, data, and workloads migrated across AWS, Azure, and GCP in 24 days through a five-stage validated process. Near-zero downtime and rollback controls built into every cutover.
Structured cost optimization delivering 20-40% savings within 24 months. Governance frameworks built alongside the savings so the results sustain themselves.
A five-stage replatforming process: Assess, Plan, Migrate, Validate, Optimize. Guesswork eliminated, cutover risk reduced at every step.
Rapid incident recovery built on high-availability architecture and expert teams that engage immediately when continuity is at stake.
Cloud rationalization programs designed to deliver measurable savings within 24 months, with a performance model aligned to the value delivered.
Recovery, replatforming, and optimization delivered as one continuous engagement, with no handoffs and no gap between phases.